Pick a unit on the map to see its reservation calendar.
No detected openings were recorded in the last 90 days. Campsite Sniper monitors Elrod Ferry continuously and will alert you if that changes.
Of the 8 tracked reservation dates (May 1 – May 4, 2027): 8 open for online reservation.
Of the open reservation dates on mapped day-use units, 4 fall on weekdays and 4 on weekends (Fri–Sun).
May holds the most room. 8 of 8 reservation dates are still open there.
| Window | Date | Units open | Status |
|---|---|---|---|
| Memorial Day | FRI May 28 | 0 | None open |
| SAT May 29 | 0 | None open | |
| SUN May 30 | 0 | None open | |
| MON May 31 | 0 | None open |
Memorial Day: no online availability on any tracked date.
| Unit | Open reservation dates |
|---|---|
| 1 | 4 |
| 2 | 4 |
The 2 day-use units with the most open reservation dates in the current snapshot. Pair a bookable date with a free alert to cover everything else.
Campsite Sniper's data for this facility starts May 1, 2027. That is about 179 days after the current snapshot was taken, so dates before May 1, 2027 are not covered by what Campsite Sniper tracks here — they are not known to be unavailable. The reservation dates shown on this page describe May 1, 2027 onwards only. Check Recreation.gov for earlier dates.
| Unit | Open reservation dates | Consecutive dates | Dates |
|---|---|---|---|
| 1 | 4 | 4 dates | May 1, 2027, May 2, 2027, May 3, 2027, May 4, 2027 |
| 2 | 4 | 4 dates | May 1, 2027, May 2, 2027, May 3, 2027, May 4, 2027 |
Elrod Ferry Recreation Area is a 39 acre site situated on a gently sloping point that overlooks the lake near Hartwell Dam. The site presently offers day use and boat launching facilities consisting of 1 gatehouse/entrance, 37 picnic sites, 2 standard picnic shelters with water and electric service, 1 boat ramp, 1 courtesy dock, 2 comfort stations, 2 playgrounds, 3 designated swim areas/beaches, 1 volleyball pit, and associated paved roads and parking areas throughout. The area experiences intense public use during the peak recreation season.
Boating and water sports top the list of popular activities. A boat ramp is available for visitors' convenience, and three designated swimming beaches are located around the facility.
The site presently offers day use and boat launching facilities consisting of 1 gatehouse/entrance, 37 picnic sites, 2 standard picnic shelters with water and electric service, 1 boat ramp, 1 courtesy dock, 2 comfort stations, 2 playgrounds, 3 designated swim areas/beaches, 1 volleyball pit, and associated paved roads and parking areas throughout.
Hartwell Lake is a man-made lake bordering Georgia and South Carolina on the Savannah, Tugaloo and Seneca Rivers. The dam and lake area boasts 8 campgrounds and 11 day-use facilities that are operated by the US Army Corps of Engineers. The Hartwell Project was originally authorized for hydro-power, flood control, and navigation. Later, recreation, water quality, water supply and fish and wildlife management were added. Surrounding vegetation allows for plenty of shade, and the 962 miles of shoreline provide numerous swimming beaches, picnic areas and boat ramps.
From Hartwell, GA, travel approximately 2.5 miles on Highway 29 North. Turn left onto Elrod Ferry Road, and after a mile follow the brown directional signs to the facility. 1387 ELROD FERRY ROAD, Hartwell GA 30643
View on Recreation.gov ↗ Get directions ↗





Reservations for Elrod Ferry are made through Recreation.gov. The current snapshot shows substantial availability: 8 of 8 tracked reservation dates are open (100%), though availability can change. Pick the unit on the map to see its reservation calendar, or set a free Campsite Sniper alert. You complete the reservation yourself on Recreation.gov.
No. Campsite Sniper sends alerts and direct Recreation.gov links. It never books, pays for, holds, hoards, or resells reservations.
Campsite Sniper re-checks public Recreation.gov availability for this facility every hour and republishes whenever anything changes. This facility's data last changed at Nov 3, 2026 00:18 UTC; an older timestamp means nothing has changed since that time, not that checking stopped. Always confirm final availability on Recreation.gov when you book.
May 2027, with 8 open reservation dates in the current snapshot of 8.
Campsite Sniper cannot answer that from the current snapshot. The availability data held for Elrod Ferry begins May 1, 2027 — about 179 days after this snapshot was taken, so any earlier dates are outside what Campsite Sniper is tracking here rather than known to be unavailable. Check Recreation.gov for dates before May 1, 2027.
Choose the reservation dates you want at Elrod Ferry.
Campsite Sniper can monitor this facility and notify you if a selected date becomes available.
When a selected date becomes available, you get a push with a Recreation.gov link so you can review and book it yourself.